Getting loading bays back up and running

Getting loading bays back up and running

New loading bay installation

At ABC we know how much a new loading bay installation can help a business, as it allows the loading and unloading of goods in the safest and most efficient way possible.

It is important that every part of the loading bay is fully operational for it to work as effectively as possible. Dock shelters secure vehicles in place so that staff can work safely, dock levellers compensate for the differing heights of lorry floors and ramps, and dock buffers reduce wear on vehicle bumpers and the loading bay area.

A fellow North West based company who pride themselves on professional and experienced service found their dock shelters in a poor state. As one of the leading building contractors and shopfitters in the region, when their loading bays needed replacing it was crucial that the works could be carried out quickly and effectively.

We attended their site to remove and replace two dock shelters, two sectional doors, and two levellers.

old loading bay configuration at B Melling
The old loading bay configuration
New Loading Bay installation at B Melling
The brand new loading bay installation

We then tested the brand new equipment we had installed, ensuring that everything was running perfectly before we completed work on the site. For more info on the types of loading bay equipment we supply and install, click here.