MCDONALDS DISTRIBUTION WAREHOUSE COVENTRY 26 NEW LOADING BAYS

This install was all about timescale with just 10 Weeks from the placement of Order to finished install.

The 26 loading bay refurbishment included new doors, dock levellers, loading shelters, dock lights, traffic lights and buffers.

We installed, wired and commissioned all 26 bays on time and within budget enabling the Distribution Centre to hit its go-live date.

By choosing ABC the customer now has an extremely robust durable loading bay solution.

The pictures speak for themselves and we are extremely proud of this install.

Whether your an architect, project manager, landlord or direct customer please do not hesitate to enquire about our loading bay solutions.

Further reading

ABC Doors Commercial Fit Out Case Study Thumb

A Full Commercial Unit Fit-Out, Manchester

24 Apr 2024

The brief? A full commercial unit fit-out with compliant products, installed by professionals at three large warehouse units in Manchester - a classic job for ABC Doors!

Read more

ABC Doors Tesla Case Study Thumb

Transformative Curtain Walling at Tesla Showroom

23 Nov 2023

A large sectional door was removed and a curtain wall with integral entrance doors was installed, creating an attractive façade that allowed natural light to flood the Tesla showroom area.

Read more

Openshaw 1

Ensuring the Safety and Security of the Children at Openshaw Community School

24 Aug 2023

School children’s safety is dependent on a safe and secure environment, which includes regularly checked and serviced doors.

Read more